Arrow AK600 Instruction Manual Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 4
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
Anchors are at proper depth when there is 1"
(25mm) space under the eye as shown.
Move Floor Frame back in position over
Anchors. Turn each Anchor slightly as necessary
to align eye with slots in Gusset so that Floor
Frame will rest on the ground.
STEP 3
Tightening the Anchors
1. Insert a Retainer (tabs pointing down) under the
eye of each Anchor so that tabs drop into slot in
Gusset. Retainer must be flat against Gusset.
2.
Turn Anchor clockwise until eye is
firmly
against
Retainer. DO NOT OVER TIGHTEN!
Turn Clockwise
into ground
IMPORTANT:
Anchor
must
go straight down into
the ground. Do not allow Anchor to
angle or wander from the starting
point.
4.
5.
NOTE: Each Corner Anchor can be tightened much
easier with the Corner Panel removed from
building.
IMPORTANT: Re-install each Corner Panel
before removing another
Corner Panel from building.
"Starter
Hole"
Gusset
EyeSlot
Turn Clockwise To
Tighten
Anchor
Eye
Gusset
Retainer
Slot
TIGHTEN ANCHORS
ONLY
AFTER BUILDING HAS BEEN ERECTED.
CAUTION
PU3
3
Page view 2
1 2 3 4

Comments to this Manuals

No comments