Arrow CHD1010 Instruction Manual Page 34

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 33
34
C
D
SB
Step 11: Continued
34H
DO NOT fully tighten Ridge Cap bolts until you
have both Ridge Cap bolts in place. This will ease
assembly. Bolts must be fully tightened before moving on to
the next page.
For 10’x15’ (3,0 m x 4,6 m) or larger.
10621
For 10’x10’ (3,0 m x 3,1 m) ONLY.
You will need:
Ridge Cap -
F/R
2
10621
(QTY: 2)
SB
You will need:
Ridge Cap -
F/R
1
10621
(QTY: 2)
SB
Ridge Cap -
Mid
1
10680
End of Ridge Cap with four holes must
face toward the outside of the building.
Do not secure at this time.
End of Ridge Cap with four holes must
face toward the outside of the building.
Do not secure at this time.
A
B
C
D
A
B
SB
Overlap two Front and Rear Ridge Caps
as shown and secure with two Small
Bolts and Nuts.
5
5
Overlap one Front and Rear Ridge
Cap and one Mid Ridge Cap as
shown and secure with two Small
Bolts and Nuts.
10621
10621
10680
Page view 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 47 48

Comments to this Manuals

No comments