Arrow VT1431 Instruction Manual Page 25

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 24
1 Position Truss Assembly on build-
ing by sliding column gussets over
center columns and fasten with 8
bolts and nuts on each gusset.
2 Position right and left side eave
channels over eave brackets and
fasten with a bolt and nut. Front and
rear frames overlap side eave chan-
nels. Fasten overlaps with 3 bolts
and nuts. Fasten corner panels to
channels using 4 screws.
NOTE
On the 1431, fasten the side
eave channels over eave brackets
using bolts and nuts.
Step 10
BX25
Parts Needed For
Truss/Top Frames
Truss Assembly (1 14x21) (2 14x31)
9484 Right Side Eave Channel (2)
9485 Left Side Eave Channel (2)
9463 Side Eave Channel (2 14x31)
25
STEP
2
STEP
1
9485
(1421)
9484 Installed in Step 8
9485
9484
9463
9463
(1431)
Page view 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 43 44

Comments to this Manuals

No comments