Owner's Manual & Assembly Instructions D01 Exterior Dimensions Interior D
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
11Remove from bag of screwsand save for the last step67545Weather Stripping (1)66382Lower Door Guide (4)66183Roof Trim Cap(2 right & 2 left)66045H
Parts List D1212Assembly Part Part Quantity CheckKey No. Number Description in Carton List 1 8934 Ramp 1 2 5986 Rear Wall Angle 2
13Assembly by Key No. D1332313336132511251229843029313630274592310462614573730302810101813313019253310192912256303026143630481110292328282727182222
The front floor frame is made up ofthree pieces. The side floor framesand the rear floor frame are made upof two pieces. The holes in thesepieces will
Step 2D1515● Parts Needed For ●Frame AssembliesThe main frame pieces reinforce thewalls. These pieces will later be in-stalled in the center and at th
16The roof beams join the two gablesand support the roof panels. The mainroof beam is made up of four piecesoverlapped back to back at the cen-ter. Th
17NOTE:Door Track Splice (painted part)Step 4A17● Parts Needed For ●Door Track Assembly●●●●● 6403 Door Track Splice (1)●●●●● 9366 Door Track (2)66769S
●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)● Parts Needed For ●Floor FrameStep 5A18The floor frame must b
1 Position a corner panel at thecorner of the floor frame as shown.The widest part of each corner panelmust be placed along the side of thebuilding f
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
The main frame pieces give rigidity tothe side walls and provide a surfacefor attaching the gables which sup-port the roof.1 Fasten the rear wall ang
Step 8D21● Parts Needed For ●Wall Panels●●●●● 7332 Wall Panel (4)●●●●● 6515 Wall Panel (4)The wall panels come in two widths.Each wall panel has a cri
●●●●● 9369 Door Jamb (2)●●●●● 9365 Front Wall Channel (2)● Parts Needed For ●Front Channel/Door JambStep 9D22The door jambs reinforce the dooropening
23The gables go on top of the front andrear walls to support the roof beams.NOTEThe gables are packed nestedtogether and might be mistakenas one piece
● Parts Needed For ●Gables/Roof BeamsStep 11D24●●●●● Left Gable Assemblies (2)●●●●● Right Gable Assemblies (2)●●●●● Single Roof Beam (2)●●●●● 6636 Gab
● Parts Needed For ●Roof Beam/BracesStep 12D25●●●●● Main Roof Beam (1)●●●●● 6227 Roof Beam Brace (2)251 Fasten the track supports to thefront gable as
26Step 13AY26● Parts Needed For ●Right Roof Panel●●●●● 8462 Right Roof Panel (1)Installing the roof panels is best donewith a step ladder. Begin inst
1 Install a left roof panel at the leftrear and right front corner of the roof.Install a right roof panel at the leftfront corner of the roof.3 Instal
28Step 15D28● Parts Needed For ●Ridge Caps & Panels●●●●● 8840 Ridge Cap (3)●●●●● 5209 Roof Panel (2)●●●●● 8486 Ridge Cap (3)1 Install the 3 ridge
1 Attach the right and left side rooftrim to the lower end of the roof pan-els on each side of the building usingscrews at each panel overlap.NOTEA si
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go
30●●●●● 3719 Door Handle Brace (2)●●●●● 10475 Right and Left Doors (2)●●●●● 10497 Horizontal Door Brace (4)●●●●● 6278 Vertical Door Brace (2)●
31Step 18A31● Parts Needed For ●Door Installation & Adjustment●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)1 From inside the building,
709040310CO108-A DK108 LB108-B LX108-A RV108 VS108-A WV108-A YT108-A 697.68603 697.68629
4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
ACCESSORIES... A6 WEB6* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20,3-30,5 c
THIS PAGEWASLEFTBLANKINTENTIONALLY7
THIS PAGEWASLEFTBLANKINTENTIONALLY8
The Base For Your Building9FRONT(DOOR)FRONT(DOOR)Base A09Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR FRAME KIT: (Ord
Comments to this Manuals